The Problem

The App Store deadline wasn't moving, but the planned scope wouldn't fit inside the remaining runway. The choice was between slipping the date or cutting the product down to what could actually ship well in the time left.

My Role

Product Lead — MVP, owning the app end to end from idea through to App Store launch, on contract.

The Approach

Cut scope by 40% — trimming features, modes, and languages down to what the launch actually needed — holding acceptance criteria tight on what remained rather than loosening quality to compensate. Built the feedback loop — activation and course completion — into the product from day one instead of bolting it on after launch. Alongside the build, raised ticket quality and QA standards to the point where the team could run the release cadence on its own.

The Outcome

  • Shipped to the App Store on the original deadline, after a 40% scope cut
  • Activation and course-completion tracking built in from day one, not added later
  • Team now runs the release cadence independently, off the ticket and QA standard introduced during the build